Falls Village, CT 06031
Just edit this element to add your own HTML.
BATES CONTRACTING llc.
BATES CONTRACTING LLC.
Schedule a meeting at the location with the Town Sanitarian and an engineer, if necessary to perform Deep holes and Perks test to determine the quality of soils.
From the soil test an approved deign or an engineered plan can be created.
With an Engineered plan we can make a thorough Estimate for the total project.
The septic system will then be built to the specifications of the plan.
Upon a final approval on the construction of the system by the Town Sanitarian the Landowner will receive a Permit to Discharge and the new system and the project will be complete.
Two rows of concrete trench boxes plus pipe and stone in select septic sand.
A lawn with a septic underneath at the completion of the system.
After construction everything will be returned to look the same as it did at the start of the project.